无码中文字幕一Av王,91亚洲精品无码,日韩人妻有码精品专区,911亚洲精选国产青草衣衣衣

Your’re Here : Home > News

First batch of equipments for NK/JC Hydroelectric Project arrived in Argentina

Updated: 2015-07-29

On July 28, 2015, the first batch of construction equipments procured in China for NK/JC Hydroelectric Project arrived in Argentina's south province Santa Cruze, the province where the President Nestor Kirchner and Governor Jorge Cepernic Hydroelectric Project on Santa Cruz River (hereafter as NK/JC) located.

53 sets of construction equipments including dump truck, hydraulic backhoe, bulldozer, hydraulic drilling machine, loader, land leveller, vibrating roller, etc. were transported to Argentina, which laid a stone for subsequent constructing work to be started on September 15. Argentinean President Christina published this news on her Twitter to show her endorsement of NK/JC’s project progress on August 1, 2015.

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright ? 2013 China Gezhouba (Group) Corporation. All rights reserved.